How-To Guides

How to make a foreign trade quotation professionally? FOB/CIF quotation elements and 5 common pits

📅 2026-09-28 ✍️ 企航智联贸易研究院 👁 69 views
How to make a foreign trade quotation professionally? FOB/CIF quotation elements and 5 common pits

A professional quotation means that eight necessary elements are complete, trade terms are clear, and cost logic can be explained.At present, when making a quotation, two variables must be clearly written: one is the exchange rate, according toShanghai securities newsIt was reported that on September 28, the central parity rate of the RMB against the US dollar was reported at 6.7399, up 90 basis points, setting a new high since February 2023. A stronger RMB will directly eat up profits quoted in US dollars; the second is freight rates, according toShanghai shipping exchangeData, SCFI has risen for eight consecutive weeks, reporting 3686 points. Starting from October 1, the GRI of the U.S. line will be increased by US$2,000 - 3,000 per 40-foot cabinet. Drewry's WCI on September 24 will be US$4,468/40 feet (Shanghai-Los Angeles 7838, Shanghai-New York 10373).

The quotation is not a price list, but the first document for the customer to judge whether the factory is reliable. Only by complete elements, accurate terminology, and keeping floating terms can we not only accept orders but also maintain profits.

1. 8 essential elements for a quotation

2. FOB and CIF: The difference between one word and the responsibility is much worse

comparison itemFOB (Free on Board at Port of Loading)CIF (cost plus insurance plus freight)
cost componentsEx-factory cost + inland freight + customs declaration fee, foreign section shipping premium is borne by the buyerAdd sea freight and insurance premium on FOB basis
Who makes reservationsBuyers designate freight forwarders to book shippingSellers book and insure
Risk transfer pointThe goods are loaded on board at the loading portThe risk is transferred upon loading on the ship at the port of shipment, but the freight insurance is paid by the seller to the port of destination
Suitable for the sceneCustomers with freight forwarding resources and mature cooperationFor new customers, buyers who are unfamiliar with logistics, sellers are more controllable

Ideas that novice factories can refer to: New customers first start from CIF-type conditions and have the initiative to book space; customers with mature cooperation can cooperate on FOB, but they must pay close attention to freight forwarding and loading time.

3. 5 common pits and pit avoidance methods

Pit 1: Quotes do not include exchange rate fluctuation clauses

The RMB has continued to strengthen recently. If the price of long-term orders is only locked at the time of signing, the profit during delivery may be eaten up by the exchange rate. Practice: The quotation states that "the quotation is based on the exchange rate of a certain day, and the two parties will negotiate and adjust it when the fluctuation exceeds the agreed range."

Pit 2: No freight rate explanation is included in CIF reporting during peak season

SCFI has risen for eight consecutive weeks. Starting from October 1, the GRI of the US line will be increased by US$2,000 - 3,000 per 40-foot container. If the CIF quotation does not specify the basis for the freight rate, the price increase will have to be absorbed by itself when booking. Practice: Mark "Sea freight is based on the actual rate on the booking date."

Pit 3: There is no quote validity period

Raw materials and exchange rates are both moving, and indefinite quotations are tantamount to digging a hole for yourself. Practice: Clearly write the words "This quotation is valid for 30 days from the date of issue" and set it according to the actual cycle.

Pit 4: The payment method is written too casually

Only writing "T/T" without ratio and time point is equivalent to opening up risk exposure. Practice: Write complete conditions such as "T/T 30% deposit, 70% payment on a copy of the bill of lading", and new customers should use credit sales with caution.

Pit 5: Specifications and certification terms are vague

The customer's drawings are inconsistent with the quotation specifications, which is a high-risk area for disputes in the later period. Practice: A specification confirmation column is attached to the quotation sheet, indicating which version of drawings the quotation is based on and who will bear the export certification fees.

4. Cost accounting: Where does the confidence of the quotation come from

Foreign trade quotation cost accounting and sea freight calculation

5. Presentation details of the quotation

Professional foreign trade quotation layout and company header display

6. Special reminders for peak season quotations

Concentrated shipments before the holiday: container ships to the United States increased by 8.3% year-on-year in half a month, and port throughput increased by 4.4% year-on-year in four weeks. Both shipping space and delivery dates may be tight. When quoting, the delivery time is provided with a buffer, it is clear that "the actual booking shall prevail", and the cost of the U.S. line after the GRI increase on October 1 will be confirmed in advance with the freight forwarder, and then the CIF price will be quoted to the customer.

3 issues that factory owners are most concerned about

Customers are only willing to make FOB. Do you want to accept it?

You can accept it, but the risks in the link must be controlled: confirm the freight forwarding qualifications, loading dates and trailer arrangements specified by the buyer, and leave a written record of the handover of documents; also confirm the IOR importer qualifications (Form 5106) with the customer for orders to the United States to avoid the goods arriving at the port. Stuck.

The exchange rate is constantly changing, how to determine the quotation?

When quoting, the median price of the day is used as a reference basis and floating terms are written, for example,"Based on the median price of 6.7399 on September 28, fluctuations exceed the agreed range are negotiated by both parties"; large long orders can communicate with banks with forward currency locking tools to turn Uncertainty into controllable costs.

When quoting CIF price, how much is the sea freight calculated?

Check the latest freight rates one by one by one according to the port of destination: Shanghai Shipping Exchange SCFI sub-route quotations and Drewry WCI can be used as a reference, plus peak season surcharges; the quotation states that the freight rates are valid and "subject to the booking date", so the freight rates will not fluctuate completely on you.

Conclusion and action recommendations

A quotation is the facade of foreign trade and the first gate to profit: 8 elements are fully matched, FOB and CIF responsibilities are clearly defined, exchange rates and freight rates are written into the terms, and 5 common pitfalls are avoided in advance. It is recommended to upgrade the company's quotation template to a version today according to the list here. If you want to evaluate your factory's overseas plans, you can contact Qihang AI (telephone 180-0327-6609).

This article was written by Qihang Zhilian Trade Research Institute and was released on September 28, 2026. Please refer to the latest requirements of the competent authority for policy content.

Need a professional AI-driven export lead-generation plan?

Contact us: 180-0327-6609 — get your first batch of overseas buyer leads free of charge.

Talk to an advisor

Related articles

Daily customs data
Export YoY +14.6%
Exports this month 2.73 trillion

Top 3 exports

Integrated circuits+95.4%
Automotive (incl. chassis)+47.1%
Ships+29.8%
View full data
Go
Try
FREE
Contact
Us
180-0327-6609